"Trenchless ENGINEERING" International Conference, Exhibition and Technology Shows took place between June 6th and 8th 2017 in splendidly renovated historical interiors of Water Treatment Plant MPWiK SA in Krakow - Bielany.
conference
The lectures during the Conference, presented simultaneously in two separate rooms, were concerned issues of trenchless (no-dig) construction and renovation.
workshops
Theoretical and practical workshops addressed to various groups of specialist took place on June 6th.
discussion panels
During the Conference were discussion panels on the trenchless technology issues.
technology shows
Conference participants had the opportunity to see the latest technologies during live shows.
exhibition
An integral part of the Conference was the biggest exhibition of the equipment and devices used in trenchless (no-dig) engineering.
TYTAN Awards
The unique to the European scale TYTAN prize goes each year to specially distinguishing companies within the trenchless technology discipline.
An integral part of the Conference was the biggest exhibition (free entrance) of the equipment and devices used in trenchless (no-dig) construction, networks rehabilitation and other elements connected with this subjects. The exhibition gave the opportunity not only to see specialized showpieces, but also to get a professional opinion on the practical aspect of the equipment.
Direct contact with the producers and suppliers of the equipment, technologies and variety of services in one place was a chance to improve the quality of the business.
The unique to the European scale prize TYTAN, granted by magazine "In偶ynieria Bezwykopowa" [Trenchless Engineering] as well as by votes of the Jury, goes each year to specially distinguishing companies within the trenchless (no-dig) technology discipline, not only from Poland but from the whole Europe. The prizes are awarded since 2003 at the Gala during the annual International Conference, Exhibition and Technology Shows Trenchless ENGINEERING. Last award ceremony took place on 7th June 2017 during the said event, which was held June 6-8th in Krakow.
SEE LIST OF REFERENCES AND PRELEGENTS
To read the papers within a session, choose one of the rooms and then click on the name of a session, or on the arrow next to it.
Selected issues concerning the design of the pipeline rehabilitation liners in reference to the DWA-A 143-2 guideline
Leaders:
dr in偶. Tomasz Abel, dr in偶. Bogdan Przyby艂a, Beata Nienartowicz
The goal of the workshops is to discuss the basic rules of designing pipeline rehabilitation liners in reference to the DWA-A 143-2 guideline and the audit work issues.
Discussed topics will include:
• assessment of the existing pipeline,
• rehabilitaion methods in reference with the assessement outcome,
• input data for the design and the load imposed on the liner,
• imperfection problem, technical state III and IIIa,
• determination of the internal forces and dimensioning for operation and mounting,
• calculation scheme
• quality of work assessment
During the lecture there will be discussed rules of liners dimensioning in reference to the DWA-A 143-2 guideline
Selected issues concerning the design of the pipeline rehabilitation liners in reference to the DWA-A 143-2 guideline
Leaders:
dr in偶. Tomasz Abel, dr in偶. Bogdan Przyby艂a, Beata Nienartowicz
The goal of the workshops is to discuss the basic rules of designing pipeline rehabilitation liners in reference to the DWA-A 143-2 guideline and the audit work issues.
Discussed topics will include:
• assessment of the existing pipeline,
• rehabilitaion methods in reference with the assessement outcome,
• input data for the design and the load imposed on the liner,
• imperfection problem, technical state III and IIIa,
• determination of the internal forces and dimensioning for operation and mounting,
• calculation scheme
• quality of work assessment
During the lecture there will be discussed rules of liners dimensioning in reference to the DWA-A 143-2 guideline
Plans and experiences of Gas Transmission Operator GAZ-SYSTEM S.A. in the field of trenchless construction of the crossings in gas transmission pipelines - Ma艂gorzata Bu艂a艣, Roland Ko艣ka, GAZ-SYSTEM S.A.
Condition Assessment of Large Diameter Pipes: The MAC System - Dipl.-Ök. Roland W. Waniek, IKT – Institut für Unterirdische Infrastruktur gGmbH
Challenges and chances for HDD industry and objectives of the DCA - Marc Schnau, DCA-Europe
Modernization and construction of a sewerage network in Krakow, Poland under the GW艢 project the phase V 2014-2020 - Marcin 艁ukaszewicz, Municipal Water and Sewage Company S.A. in Kraków (MPWiK S.A)
Sealing the connections – today and in the past - BLEJKAN S.A.
Feasibility studies for the drilling projects (HDD, microtunneling, Direct Pipe) - Robert Osikowicz, ROE
Innovations in HDD product and support - Randy Rupp, Ditch Witch
Drilling fluids with a very low friction coefficient - Rafa艂 Le艣niak, HEADS sp. z o.o.
Experiences acquired during the DN1000 gas pipelines HDD and Direct Pipe installation - Jakub Hilarowicz, Marcin Firkowski, PPI CHROBOK S.A.
Unglazed clay jacking pipes Naylor Drainage LTD – non-standard parameters and the Polish and international appliance examples - Krzysztof Kaczmarek, Naylor Polska
Construction of a sewage collector as part of an investment project called "Development of the New Center of Warsaw” - Tomasz Poloczek, HABA-Beton Johann Bartlechner sp. z o.o.
Junikowski collector in Poznan - a demonstration of GRP application possibilities - Robert Walczak, Amiantit Poland sp. z o.o.
Innovative LED BLUELIGHT channel and connections renovation system - Aquaren and Kraso-Tech
Safe work in the closed spaces - 3M Poland sp. z o.o.
Direct Pipe – a technoeconomic analysis, based on the executed projects - Dymitr Petrow Ganew, Herrenknecht AG
Mechanical properties of laminate coatings and their effectiveness as an anti-corrosion layer for HDD cables - Adam Bok, Proma sp. z o.o.
Required research for long distance horizontal directional drilling - dr Henk M.G. Kruse, Deltares
Record crossing in HDD technology - Günter Kruse, LMR Drilling GhmH
Bottom Hole Assembly. Selection of drillng string components and downhole tooling - Roberto Maestrello, Colli Equipment
Calculating microtunneling jacking forces - Krzysztof Michalczuk, SGGW Faculty of Civil and Environmental Engineering, Department of Geoengineering, Deputy Director in In偶ynieria Rzeszów S.A.
The gala will take place in room 1 at Water Treatment Plant MPWiK w Krakowie
Practical aspects of polyurea spray method in water-line renovation. Expert analysis - Jakub Wiernicki, TERLAN sp. z o.o.
The response to the emerging needs of the market related to the reducing pipeline construction and maintenance costs – Hobas Top Performance Pipes - Dariusz Kosiorowski, HOBAS System Polska sp. z o.o.
The prospect of cracking on the Polish market based on the use of pipeline renovation techniques analysis. Technical and economic aspects of the cracking method used for the water and sewage networks renovation - Andrzej Wieszolek, TRACTO-TECHNIK GmbH & Co. KG / DTA-TECHNIK sp. z o.o.
Problems with water supplies for shale gas production - prof. dr hab. in偶. Marian Kwietniewski, Warsaw University of Technology
Fix and forget. PEHD pipes relining as a durable and effective pipeline renovation method - Pawe艂 Pill, Uponor Infra sp. z o.o.
Application of the fused basalt elements in sanitary and combined sewage and water supply networks in Poland - Wojciech Koz艂owski, Eutit Polska
Advanced composite solutions for the structural rehabilitation of pipelines - Christoforos Kolyvas, Insituform Linings
Market experience and reference projects of the 3M Scotchkote 2400 polyurea renovation - Marcin Lukasik, 3M Poland sp. z o.o.
Innovative LED BLUELIGHT channel and connections renovation system - Aquaren and Kraso-Tech
Safe work in the closed spaces - 3M Poland sp. z o.o.
Risk concerning rehabilitation of closed sewers wth internal diameter bigger than 1 m - dr in偶. Andrzej Kolonko, prof. dr hab. in偶. Cezary Madryas, dr in偶. Leszek Wysocki, Wroclaw University of Technology
Sewerage tightness measurements - the theory and the reality - Micha艂 Andrzejewski, Gamm-Bud sp. z o.o.
Short pipe modules in trenchless technologies - Andrzej Roszkowski, ARC
Trenchless renovation of pressure pipes: the PW-LINER usage - Adam Gonera, MC-Bauchemie sp. z o.o.
The Future of the water supply pipeline trenchless renovation - Process Phoenix Double Jacket - based on the examples of completed projects- Christoph Pietryja, Preuss Pipe Rehabilitation Polska sp. z o.o.
Online marketing. Current trends and tendencies- Tomasz 艁ucek, New Idea House sp. z o.o.
The gala will take place in room 1 at Water Treatment Plant MPWiK w Krakowie
Discussion panel: Executing the water and sewage project in the new legal reality
Moderator: Piotr Zi臋tara, President of the Board of Municipal Water and Sewage Company S.A. in Kraków (MPWiK S.A)
QRA (Quantitive Risk Assessment) methods in drilling projects risk management - Kamil Kasprzak, ROE
Do we need slurry and technological supervision? man and technological supervision? If so, when do we need it?- Jacek Jaworski, HEADS sp. z o.o.
Closed loop drilling fluid system. Applications, configuration, economical aspects- Raymond Petiet, Normag bv.
Implementation costs analysis of constructing a medium- and low-pressure gas network with connections – open-cut vs. trenchless - dr in偶. Florian G. Piechurski, Silesian University of Technology
Alternative method of trenchless pipe installation - Short Arc Pipe - Marián Kr膷ík, Hydrotunel, s.r.o.
Trenchless pipeline replacement with Scandinawian No-Dig Center, Mini-T model - Heads sp. z o.o. representative of Scandinavian No-Dig Centre A/S company in Poland
Organization, qualificationsand experience of the persons assigned to the order execution as a tender evaluation criterion- Wioletta Kubica, Municipal Water and Sewage Company S.A. in Kraków (MPWiK S.A)
Investments in the water and sewage sector in the light of the Urban and Construction Code draft - Emilia Topolnicka, Kancelaria SMM Legal
The impact of the Public Procurement Law amendment on the non-price tenders' evaluation criteria popularity - the discussion panel introduction - Dariusz Ziembi艅ski, Kancelaria Ziembi艅ski & Partnerzy
Tenders' evaluation criteria: safe or innovative?
Moderator: Dariusz Ziembi艅ski, Kancelaria Ziembi艅ski & Partnerzy
Discussion panel: Executing the water and sewage project in the new legal reality
Moderator: Piotr Zi臋tara, President of the Board of Municipal Water and Sewage Company S.A. in Kraków (MPWiK S.A)
Investment challenges in the water and sewage industry - dr in偶. Tadeusz Rzepecki, IGWP, Tarnowskie Wodoci膮gi sp. z o.o.
The problem of the CIPP sewage pipes renovation acceptance - dr in偶. Dariusz Zwierzchowski, Centrum Bada艅 i Certyfikacji sp. z o.o.
Systemic approach towards the impact of the drainage system on the neighboring infrastructure assessment - dr hab. in偶. Jadwiga Królikowska, prof. PK, Cracow University of Technology
Trenchless pipeline replacement with Scandinawian No-Dig Center, Mini-T model - Heads sp. z o.o. representative of Scandinavian No-Dig Centre A/S company in Poland
Organization, qualificationsand experience of the persons assigned to the order execution as a tender evaluation criterion- Wioletta Kubica, Municipal Water and Sewage Company S.A. in Kraków (MPWiK S.A)
Investments in the water and sewage sector in the light of the Urban and Construction Code draft - Emilia Topolnicka, Kancelaria SMM Legal
The impact of the Public Procurement Law amendment on the non-price tenders' evaluation criteria popularity - the discussion panel introduction - Dariusz Ziembi艅ski, Kancelaria Ziembi艅ski & Partnerzy
Tenders' evaluation criteria: safe or innovative?
Moderator: Dariusz Ziembi艅ski, Kancelaria Ziembi艅ski & Partnerzy
320
participants
50
papers
49
speakers
32
company stands
If you have any questions regarding the conference, please contact us via the form below. WARNING! Please do not submit application for participation via the form below. Application for participation is possible only by an application form.