Junikowski collector in Poznan - a demonstration of GRP application possibilities
Poznań is currently executing the project titled: "Water and sewage management for water resources protection in Poznan and its surroundings - stage VI". One of the tasks is to expand Junikowski sanitary collector with GRP pipes. A wide range of AMIANTIT GRP pipes was used for the construction - they were installed both trenchlessly and in the open excavations. The paper also includes information on the production range of GRP systems, showing the flexibility of the offer in terms of technical and economic optimization, based on the examples of other AQUANET S.A. Poznan investments.
Robert Walczak, Amiantit Poland sp. z o.o.
Wrocław University of Technology graduate; underground engineering and urban engineering specialist. He started his career as a special foundation engineer at KGHM. Since 2000 he has been working in the GRP pipe industry as an application engineer for trenchless installations. Since 2002 he has held the position of technical manager at AMIANTIT Poland sp. z o.o., producer of GRP piping systems.