Tomasz Abel

The acceptance of the works guidelines for renovation technologies

The acceptance of the works concerning sanitary networks renovated using the trenchless technologies, should be based on the tests results of the physical parameters characteristic for the particular solution. Equally important elements are the tests including visual assessment, concerning the accuracy of renovation layer in terms of its geometrical correctness and other characteristics that could lessen its quality. The range of conducted tests should be concurrent with the current standards and executed by the independent laboratories. During the lecture, a range of tests included in the guidelines will be presented. This range should be defined by the project guidelines and depend on the used technology.

dr inż. Tomasz Abel, Wroclaw University of Science and Technology

Graduated from the Department of Civil Engineering, Wroclaw University of Science and Technology. His doctoral thesis, dedicated to the strength properties of pipelines renovated using trenchless technology, was published in 2011. Currently an assistant professor in the Department of Structural Mechanics and Municipal Engineering, Wroclaw University of Technology. He is a specialist in the use of trenchless technology in pipelines’ construction and renovation. Author and co-author of numerous scientific and technical publications as well as expertise and construction projects in the field of underground transport infrastructure, including those implemented by the Wroclaw University of Technology and the Chief Technical Organisation. Active participant in conferences and symposia in the field of underground engineering. He cooperates with domestic and foreign construction companies.

Michał Andrzejewski

Fixing the sanitary wells – the methods’ review

During the presentation, there will be discussed the most popular methods of fixing the sanitary wells, in the context of the technology and the necessary equipment and used materials.

Michał Andrzejewski, Gamm-Bud sp. z o.o.

West Pomeranian University of Technology Szczecin graduate. Company owner since 1986. In 1992 appointed as Managing Director Gamm-Bud, which is a supplier of telecommunication and water and sewage equipment.. He is the author of more than 50 publications in the trade press and the co-author of the book “Methods of laying telecommunication cables in underground urban infrastructure”. Moreover, he is a constructor of fiber optic cable blowing machines and sewer repair systems.

 

Adam Bok

The properties of the new generation glass and resin laminates. Chemical adhesion as the durability of isolation warranty during the drilling and pipe jacking

Adam Bok, Proma sp. z o.o.

 

Marek Borkowski

The experiences of the investors: designing, planning, executing, supervising and acceptance of the works done using the no-dig methods illustrated by the case of Aquanet S.A.

Conducting a project including the usage of trenchless methods links to many problems, concerning, for example, the execution of the project or some social aspects of the project. Primarily it generates many actions concerning preparations: planning, tenders preparation, obtaining all of the necessary permissions, designing.

What should we consider? To what should we be attentive? What should we choose? During the presentation, there will be discussed the aspect of the most important problems and obstacles that are faced by the investor during the execution of the particular project phases. A special emphasis will be put on those aspects that have an impact on increasing time and funds consumption.

Marek Borkowski, Aquanet S.A.

Radosław Bujak

The Analysis of Pipeline Pulling Forces In HDD Projects Based On Real Data

This presentation provides an overview of systematically conducted research and analysis undertaken in order to broaden the knowledge in the field of pipeline trenchless technologies with the application of HDD (Horizontal Directional Drilling) method. Within the course of work accessible technical data connected with the realisation of over twenty drilling projects performed by Nawitel company have been collected. The research method included, inter alia, gathering and verifying information and data registered in the drilling process. On the grounds of real values of pulling forces the accuracy of Plastic Pipe Institute model results have been reviewed. The final effect of the research and analytical work carried out will be a proposition of coefficient values for installation forces estimation models so as the received installation loads would stay at safe levels.

Radosław Bujak, Nawitel sp. z o.o. sp. k. Environmental Engineering Faculty, Wrocław University of Technology graduate and a member of the Lower Silesian Regional Chamber of Construction Engineers. He has over 20 years of experience in designing and executing projects concerning environmental engineering objects. Since 2012 r. works for Nawitel sp. z o.o. as a trenchless technologies designer. He took part in the greatest and most complicated HDD projects in Poland.

Krzysztof Czudec

A coefficient of friction in HDD boreholes

The author will discuss the phenomenon of friction between the elements od drilling conduit and borehole wall which in the case of horizontal directional drilling occurs on the full length of the borehole. The methods of calculating the friction and the impact this phenomenon has on the drilling of the boreholes will be also presented, as well as the solutions for reducing the coefficient of friction.

Krzysztof Czudec, HEADS sp. z o.o.

 

 

Anna Danek

The experiences of the investors: designing, planning, executing, supervising and acceptance of the works done using the no-dig methods illustrated by the case of Aquanet S.A.

Conducting a project including the usage of trenchless methods links to many problems, concerning, for example, the execution of the project or some social aspects of the project. Primarily it generates many actions concerning preparations: planning, tenders preparation, obtaining all of the necessary permissions, designing.

What should we consider? To what should we be attentive? What should we choose? During the presentation, there will be discussed the aspect of the most important problems and obstacles that are faced by the investor during the execution of the particular project phases. A special emphasis will be put on those aspects that have an impact on increasing time and funds consumption.

Anna Danek, Aquanet S.A.

Marcin Firkowski

Drilling in the difficult geological condition – Direct Pipe technology used for TAP pipeline construction – a case study

Over few last years, the level of trenchless projects’ complexity has risen significantly. Lack of space for laying the pipeline in order to install it, complex geological conditions, high risk of a negative impact on the environment result in searching for the innovative and technically advanced solutions.

During the presentation, there will be analyzed a case study of two Direct Pipe drillings for the Trans Adriatic Pipeline high-pressure gas pipeline in Greece. The challenge was accepted by the PPI Chrobok S.A. company, that at the beginning of this year executed a DN1200 pipeline installation under the Aliakamonas River. The installation was fully successful. It was one of the most difficult and the most challenging crossing in the history of Direct Pipe technology

Marcin Firkowski, PPI Chrobok S.A.

Faculty of Drilling, Oil and Gas at the AGH University of Science and Technology graduate. He gained professional experience during the internship on a drilling platform on the Baltic Sea and at the Saint Petersburg in Russia. He has been with the PPI Chrobok S.A. company since 2014 r., first as a drilling fluids engineer, then as a site manager during the execution of the Direct Pipe crossing for the Trans Adriatic Pipeline. Currently he deals with quotations, planning and feasibility studies for new national and international trenchless projects, as well as with managing projects.

 

Kamil Kasprzak

Quality analysis in technological processes of HDD drilling

The presentation raises the topic of quality in the drilling process itself, from the stage of preparation to the implementation of the project, up to its completion and post-project analysis. The discussed areas are adapted to the specifics of drilling projects and include quality as a coherent strategy of operation for the implementation process. The speaker draws attention to most important points during the preparatory and executive works that play a key role in ensuring and maintaining quality.

Kamil Kasprzak, ROE

Graduate of the Department of Drilling, Oil and Gas AGH in Cracow and the Faculty of Economics, University of Agriculture in Cracow. He has gained experience on numerous internships, as: National Mineral Resources University – Gornyj Institute St. Petersburg, PGNiG Jasło, GreenGas DPB Paskov, Energy Research Center Vysoka Skola Banska in Ostrava. Co-author of the development of hydraulic fracturing technology to eliminate the gas hazard for KGHM Polska Miedź S.A in the scope of configuration and selection of equipment and drilling tools. He started drilling practice in 2012 as Specialist in Injection, Rotary and Percussion Drilling. He has continuously gained his experience in several leading drilling companies, including as a R&D Drilling Technology Manager. He has been working for Robert Osikowicz Engineering (ROE) since 2016. Few of his interest includes: statistical modeling of drilling phenomena, quantitative methods of risk assessment, influence of geological conditions on drilling projects, mechanics of impact of drilling tools on rock, working environment of drilling string, occurrence of overburden hydraulic fracturing.

Arkadiusz Kieda

Arkadiusz Kieda, Saint-Gobain PAM

 

Andrzej Kolonko

Review of the pressurized pipelines’ renovation methods

Pressurized pipelines are mainly water and gas pipelines. Because of their specificity, their technical condition is not systematically assessed, unlike the gravity sewage pipelines. Technical condition of pressurized pipelines is assessed on the basis of water or gas leakages. When the level of the leakage becomes unacceptable, it is time for the renovation. If the technical condition of the pipeline is overall good and its construction safely transfers the load, it is sufficient to seal the pipe using one of the available technologies. If carrying capacity is threatened, application of the inliner (CIPP liner or a new plastic pipe with a smaller diameter) capable of transferring the loads is necessary.

dr inż. Andrzej Kolonko, Politechnika Wrocławska

Wrocław University of Science and Technology graduate. He specializes in the urban infrastructure and actively promotes modern trenchless technologies. For many years he has been the organizing secretary of the international science and technology conference. “Underground infrastructure of cities”. Wrocław University of Technology academic teacher and researcher. He cooperates with foreign scientific centres and companies. He is the author and co-author of numerous publications in national and international magazines including: “Constructions of Sewerage Ducts”, “Microtunneling” and “Renovation of water pipes by cementing”. In addition, he is the author and the co-author of three patents and a utility model.

Dariusz Kosiorowski

Dariusz Kosiorowski, Amiblu Poland

An international expert in the microtunneling and pipe jacking technology in Amiblu Group. A product manager of Top Performance Pipes and products used for trenchless technologies implementation. He took part in the designing and executing processes of the biggest jacking projects, where there were used Hobas OD3000 GRP pipes (7 km) and Hobas OD3270 GRP pipes (3 km). Formerly he worked for a company dealing with the concrete repair and protection technology.

Roland Kośka

Requirements set by Gas Transmission Operator GAZ-SYSTEM S.A. for designing and execution of trenchless HDD and Direct Pipe crossings in projects of high-pressure gas pipeline networks construction – experiences from the execution

During the presentation, there will be information given about the planned and executed HDD (Horizontal Directional Drilling) and Direct Pipe projects, as well as about the crossings being done using chambers: microtunnels, drillings, pipe jacking. Requirements concerning the design and the acceptance of the design will be also discussed. Another issue that will be discussed will include quality requirements concerning the preparations and the acceptance of the trenchless works alongside with the conditions of approval and authorisation for the drilling works for the trenchless works’ contractors.

Roland Kośka, Gaz-System S.A.

An expert in the fields of gas production and transportation, investment projects management and quality management. His acquired knowledge is supported by 20 years of experience in the implementation of the most strategic gas pipeline projects in Poland. For about 10 years tied to mining and drilling industry within the scope of the exploration and production of hydrocarbon reserves and mineral deposits. Currently he implements the trenchless technologies into the pipeline construction; organizes and supervises the process from the beginning to the end.

Günter Kruse

DCA: Recent work on standards and regulations

Günter Kruse, LMR Drilling GhmH

He has a M.S. degree in Petroleum Engineering. Currently Head of Engineering Department for LMR Drilling GmbH, a company that he is tied to since 1993. As of beginning of employment with he has been responsible for all projects with regard to Technical Management and Engineering. Previously in his professional career he had a position of, among other, Directional Drilling and Surveying Coordinator and Surveying Superintendent.

 

Henk Kruse

Horizontal directional drilling, the drilling fluid flow in the borehole

The Horizontal Directional Drilling method enables to lay a prefabricated pipeline into the ground by the creation of a borehole in which the pipeline is pulled in. The method is used for decades. Nowadays a trend to the installation of longer pipelines and larger diameters is clearly visible. Pipelines are installed faster by the reduction of the number of reaming stages during which the borehole is reamed. This faster installation process of the longer pipelines in larger boreholes is only possible by improvement of the flow of drilling fluid. The improved flow of drilling fluid is necessary for a lower pressure gradient in between the drilling head and the entry point and also for the transport of the cut soil particles out of the borehole.

dr Henk M.G. Kruse, Deltares

Senior geotechnical consult and is working in the field of underground infrastructure. He is a specialist in geo engineering of pipelines especially in the disciplines of trench less installation techniques and the effects of installation activities on the surroundings.

 

Bartosz Łuszczek

Participant of discussion panel: Financing of water and sewage industry projects – then and now

Bartosz Łuszczek, MPWiK S.A. w Krakowie

Faculty of Environmental Engineering at the Kraków University of Technology and Faculty of Management at the Kraków University of Economics graduate. Currently holds a position of a deputy director for technology and analyses of The Kraków Waterworks. He is also a representative of the Polish Chamber of Commerce “Polish Waterworks”, the European Federation of National Associations of Water Services (EurEau) and a board member of Galician Waterworks Association. Professionally he deals with the water and sewage technology, innovative projects and the legal-environmental issues concerning water and sewage sector.

 

Beata Nienartowicz

Designing in the trenchless technologies – selected aspects

Trenchless technologies are combining elements of construction and environmental engineering sectors. During the presentation, there will be discussed selected legal issues and the aspects concerning education that have a direct impact on the designers’ preparation for work in the trenchless technologies industry.

Beata Nienartowicz, Wrocław University of Science and Technology

Graduated from Wrocław University of Technology in the field of Civil Engineering. Since 2010 works as a didactic assistant at the Division of Constructions Mechanics and Urban Engineering. Her scientific activity concerns analysing of operation of the sewers renovated using trenchless technologies, as well as computer modeling of operations of underground infrastructure constructions. Acting as maintainer and operator of the “Mobile Research Laboratory of Municipal Underground Infrastructure”, Ms. Beata Nienartowicz expands her professional skills in conducting on-site tests in order to specify the technical conditions of underground municipal constructions. Author of several domestic and international publications and co-author of many scientific reports that have been realized under the Prof. Cezary Madryas supervision.

 

Robert Osikowicz

Multi-criteria analysis of the selection of a drilling technique for the large diameter pipelines installation (HDD vs DP)

The paper presents a simplified methodology for assessing the suitability of using two trenchless pipeline construction methods. Geological, technical and technological criteria as well as financial criteria are considered.

Robert Osikowicz, ROE

AGH University of Science and Technology graduate. His professional activity includes HDD technology and practical application of drilling fluids. He is also interested in feasibility, risk, quality and cost analysis for trenchless projects.
He has worked in oil companies and consultancy companies in the field of drilling and related techniques. Since 2009 he has been working for Robert Osikowicz Engineering. He publishes in magazines: Trenchless Engineering, GDMT geoengineering roads bridges tunnels, Baltic Transport Journal. He is the author of over a dozen papers delivered at international conferences. For many years he has conducted training seminars for drilling companies. He is a member of the DCA Drilling Contractors Association that gathers drilling companies, design studios and manufacturers of equipment and technology suppliers for the boring industry.

Dymitr Petrow-Ganew

An innovative implementation of the jet pump in trenchless technologies

During the presentation, there will be discussed the topic of implementing the jet pump with the hydraulic unit into the microtunneling process. This can help increase the drilling length for small diameter conduits (< DN800) up to several hundred meters. For Direct Pipe technology it will be possible to install steel 20–36” pipelines up to 1000 meters long. What’s important, durability and reliability of a jet pump are significantly greater than in the case of centrifugal pumps.

Dymitr Petrow-Ganew, Herrenknecht AG

The Faculty of Mechanical Engineering of the Technical University of Lodz graduate. Polish trenchless technology precursor. Since 1993, the promoter of HDD method. He organized the first seminars and workshops concerning HDD in Poland (1996-1999). Since 2003 he has been working for the German company Herrenknecht AG. He introduced, among the others, many TBM machines to Polish market, e.g. for metro tunnel construction. He authored the several publications and papers on microtunnelling and TBM shields. He is a member of the international organizations ISTT, ITA AITES and a member of Underground Construction Subcommittee of the Polish Committee of Geotechnics.

Florian Piechurski

Trenchless methods of asbestos cement water pipes replacement

During the presentation, a case of a water and sewage company will be analyzed. The company more and more often uses the trenchless methods of pipeline renovation. The unfavourable age (over 64% of the pipelines is older than 25 years) and material (almost 20 km of the pipelines is made of asbestos cement) structure forces the company to prepare a long-term strategy of waterworks renovation without the need to plan for 2 or three years.  The additional challenge is asbestos removal programme – until 2032 PWiK has to replace 1,3 km of the pipes a year. The possibility of the trenchless replacement of the conduits should be utilised to the maximum. A significant weight of using the trenchless methods is carried by the satisfaction of the land owners – the administration and particular individuals. The not too elaborated scope of the works and the and the speed of conducting them has a great effect on the company’s image.

dr inż. Florian Piechurski, Silesian University of Technology

 

Jacek Piotrowicz

Jacek Piotrowicz, IDS BUD S.A.

Faculty of Environmental Engineering, the Silesian University of Technology in Gliwice graduate. He works in gas industry since 1989 r. From the beginning, his career path involved the construction of gas transmission pipelines and the technological buildings. He took part in executing the most important for Polish Oil&Gas sector projects, among others: construction of Czeszów–Kiełczów gas pipeline (DN1000 MOP 8,4 MPa L=33 km), construction of Płoty–Karlino gas pipeline (DN700 MOP 8,4 MPa L=64 km); construction of Rembelszczyzna–Gustorzyn gas pipeline (DN700 MOP 8,4 MPa L=176 km), as well as the construction of the first interconnector between Polish and Czech gas network. Currently, he holds the position of the Contract Manager at IDS BUD S.A.

Bogdan Przybyła

Trenchless pipelines’ renovation methods – a classification and the conditions determining the choice of a method

The basic classification of the pipelines’ renovation (technical rehabilitation) distinguishes the terms of the pipes’ repair, renovation and replacement. During the presentation, classification of the pipelines’ renovation methods related to those basic terms  and the nomenclature used both in theory and in practice will be discussed. Representative technologies that belong to the particular groups of the recognised classification will be also presented. Included will be the conditions determining the choice of renovation method for the pipelines suffering from a different degree of damage.

dr inż. Bogdan Przybyła, Wrocław University of Science and Technology

Wrocław University of Science and Technology graduate. Participant of scientific programmes in Germany (Technische Unversität Dresden and Technische Hochschule in Münster). Currently an academic teacher and researcher at Wrocław University of Technology. He specialises in technical assessment of water and sewer pipelines. He authored and co-authored many articles and expertises. For many years he has been cooperating with Wydawnictwo INŻYNIERIA sp. z o.o., including reviewing “Trenchless Engineering”.

Andrzej Roszkowski

Design and executive practice

An effective and efficient pipe rehabilitation requires the involvement of every side of the investment process: an investor, a designer and a contractor. Trenchless methods used in such cases are still not sufficiently known by the broad range of the investors and designers, even the contractors frequently prefer to choose their own methods. It is not possible to present all of the mistakes that are being made throughout the process but displaying even a part of them will allow an improvement in the field of executing projects and operating the infrastructure.

Andrzej Roszkowski, ARC

Tadeusz Rzepecki

Financing of water and sewage industry projects – then and now

A starting point for this presentation will be the changes concerning the fees for water services, implemented as a result of the new water regulations. The author will discuss the purpose and earmarking of the fees, as well as the aspects of the support for the water and sewage companies provided by the regional environmental protection funds as well as the administration and European Union. The author will also analyze the changes in the market concerning contractor and investor assessment and the changes of projects’ financing models, based on the urban development and construction regulations.

dr inż. Tadeusz Rzepecki, prezes Tarnowskich Wodociągów sp. z o.o., przewodniczący Rady IGWP

Physicist and chemist, first-degree specialist engineer. President of the Council of the Polish Chamber of Commerce (since 2011), and President of the Tarnów Waterworks. Well-known in the water supply industry for promoting trade knowledge; he consults many programmes and technical projects. Academic teacher and youth educator, quality system auditor. The author and the co-author of several dozens of scientific and popular-scientific works.

Karol Skowera

Adhesion tests in the context of soil preparation and renovation works’ quality assessment

Over the years the term sustainability changed. Nowadays the constructions are not to “endure ages” but to last for a definite amount of time: estimated working life. The necessity of conducting any repairs and renovations forces to conducting bearing capacity tests and repairing works’ quality assessment. During the presentation, factors impacting the pull-off tests will be discussed.

Karol Skowera, Centrum Badań i Certyfikacji sp. z o.o.

Construction Faculty graduate, PhD candidate. Head of the Construction Materials Tests Workshop, leader of several research projects. Co-author of expertises and technical opinions concerning construction’s sustainability. As an employee of the Centre of Research and Certification, he gains experience in research and proper material solutions choice for the municipalities’ objects and sewerage.

Przemysław Świercz

Adhesion tests in the context of soil preparation and renovation works’ quality assessment

Over the years the term sustainability changed. Nowadays the constructions are not to “endure ages” but to last for a definite amount of time: estimated working life. The necessity of conducting any repairs and renovations forces to conducting bearing capacity tests and repairing works’ quality assessment. During the presentation, factors impacting the pull-off tests will be discussed.

Przemysław Świercz Centrum Badań i Certyfikacji sp. z o.o., ATLAS sp. z o.o.

 

Emilia Topolnicka

Legal regulations of the designer’s responsibility for the projects’ defects

During the presentation, there will be discussed the topic of the designer’s responsibility for the projects’ defects. It should be analyzed in the three dimensions: civil liability, professional liability and criminal liability. Being aware of the risk and the premises that determine the possibility of being held liable in each of these dimensions is a valuable information, both for the designer and other participants of the project execution process.

Emilia Topolnicka, Kancelaria SMM Legal

Adam Mickiewicz University in Poznań graduate. A lawyer at SMM Legal. Entered into the advocate register of the District Bar Council in Poznań, member of the Wielkopolska Bar Chamber in Poznań. She gained professional experience in law firms with a diversified business profiles. She is interested in administrative law, especially local self-government law and issues related to the municipal administration.o.

Adrian Zdunek

Technology of spiral wound pipes in the renovation of the collector in Krasiński street in Warsaw

During the presentation, there will be discussed the case of the renovation of a stormwater collector in Krasiński street in Warsaw where was used the technology od spiral wound pipes. The 2000/2700 mm collector was lined with PVC profile liner that was firstly placed in the sewer and then “zipped”. In the end, the annulus was filled with the grout and thus was made a strong and durable composite pipe.

Adrian Zdunek, RTi Poland sp. z o.o.

Dariusz Zwierzchowski

Adhesion tests in the context of soil preparation and renovation works’ quality assessment

Over the years the term sustainability changed. Nowadays the constructions are not to “endure ages” but to last for a definite amount of time: estimated working life. The necessity of conducting any repairs and renovations forces to conducting bearing capacity tests and repairing works’ quality assessment. During the presentation, factors impacting the pull-off tests will be discussed.

dr. inż. Dariusz Zwierzchowski, Centrum Badań i Certyfikacji sp. z o.o.

Since the 90. an academic teacher and researcher, firstly at Kielce University of Technology, then at Higher Engineering School of Safety and Labor Organization in Radom. President of Centre for Testing and Certification in Kielce. He authored many projects, expertises, technical opinions and scientific articles. Co-organizer of many domestic and international conferences.


Organizer

Wydawnictwo INŻYNIERIA sp. z o.o.


WFOSiGW

The task was carried out with the financial resources
of the WFOŚiGW in Krakow.

IdeaTECH

Contact

Wydawnictwo INŻYNIERIA sp. z o.o.

ul. Lindego 14, 30-148 Kraków, Poland
NIP: 677-22-03-315

+48 12 352 33 23 – Office
biuro@inzynieria.com

Marketing department:

Maciej Górnisiewicz
gsm: +48 660 288 299
marketing.ib@inzynieria.com

 

Mateusz Kaproń
gsm: +48 664 175 174
marketing.gdmt@inzynieria.com

Accounts

PLN Account
Raiffeisen Bank Polska S.A. Oddział Kraków
61 1750 1048 0000 0000 0215 9953

EUR Account
PL 09 1750 1048 0000 0000 0351 5591
SWIFT: RCBWPLPW



Porozmawiajmy

Kwestie merytoryczne:

Paweł KośmiderPaweł Kośmider
gsm: +48 606 214 393
pawel.kosmider@inzynieria.com

 

Agata SumaraAgata Sumara
gsm: +48 698 532 869
agata@inzynieria.com

 

Sprzedaż:

Maciej GórnisiewiczMaciej Górnisiewicz
gsm: +48 660 288 299
marketing.ib@inzynieria.com

 

Kwestie organizacyjne:

Izabela TarnackaIzabela Tarnacka
gsm: +48 536 487 138
biuro@inzynieria.com

 

 


WFOŚiGW w Krakowie

OTHER CONFERENCES ORGANIZED BY THE WYDAWNICTWO INŻYNIERIA:

ib button gwor button gwb button cipp button

All rights reserved. Copyright © 2018 - Wydawnictwo INŻYNIERIA sp. z o.o.