Conference Agenda

*The programme may still be subject to slight modifications.

DAY 1

11 JUNE

10:30 – 13:00

Technology shows

damian-sobczak

Damian Sobczak

Nodigmarket24

Demonstration of the mini jacking machine with the MMP-35 controlled head

During the demonstration, specialists will show the speed of the jacking machine, the possibility of changing the direction of the jacking or sinking, perform an automatic drilling profile for final documentation and a 2×110 mm double-pipe jacking of 20-30 m.
damian-sobczak

Tomasz Borowiak

SAERTEX multiCom

Installation of Saertex's styrene-free potable water transport sleeve using ProKASRO's UV lamp technology

The topic of the demonstration will be the trenchless installation of a styrene-free CIPP sleeve based on vinylester resin using appropriately sized technology.
Piotr Kosz

Piotr Kosz

Steinzeug-Keramo Sp. z o.o.

Renovation of sewer systems using polymer concrete elements

The demonstration will show polymer concrete elements used in trenchless renovation of canals, round and rectangular concrete manholes and the crown of settling tank raceways. Issues concerning the technical parameters of polymer concrete, the method of joining the elements inside the canal or manhole and recommended epoxy adhesives and injection mortars will be discussed. The show will also include information on the current and future portfolio of vitrified clay drill pipes used in trenchless sewer network construction and rehabilitation.
Mariusz Iwanejko

Mariusz Iwanejko

Blejkan S.A.
Mariusz Iwanejko

Yuliya Panchy

Hovering Solutions
Mariusz Iwanejko

Andrzej Świątek

Blejkan S.A.

Demonstration of the capabilities of Hovering Solutions' autonomous flying robots for sewer network inspection

The demonstration will showcase the capabilities of Hovering Solutions' drones performing sewer network inspections. The robots operate without remote control, radio communication, GPS/GNSS or lighting. The drones capture high-quality data, including 3D georeferenced point clouds, high-resolution panoramic images and a comprehensive damage report. This data facilitates a comprehensive assessment of tunnel condition, cross sections and tracking changes over time. Hovering Solutions provides a web-based 3D visualisation platform for easy access to the data and its analysis.
Piotr Kosz

Freestyle Motocross

Freestyle motoross performance (FMX)

Piotr Kosz

Krzysztof Michoń

MULLER Polska sp. z o.o.

Rausch Rehab milling robot - the most effective and multifunctional robot the industry has yet come to know

Innovative, powerful. Fast. Accurate. Material-friendly. Multifunctional. Cost-effective. Better and more efficient than anything the industry has known to date. Rausch Rehab customers can expect the best possible solutions for the reconstruction and maintenance of underground infrastructure.
Mateusz Saładziak

Mateusz Saładziak

Gamm-Bud sp. z o.o.

Measuring the tightness of gravity sewage systems using the air method in accordance with the PN 1610 standard

During the show, the process of measuring sewage tightness will be presented. The measurement will take place in accordance with the requirements of the PN 1610 standard and will be carried out using air. Proprietary equipment will be used to record the process.

Mariusz Iwanejko

Krzysztof Czudec

Heads sp. z o.o.
Mariusz Iwanejko

Jacek Jaworski

Heads sp. z o.o.
Mariusz Iwanejko

Rafał Leśniak

Heads sp. z o.o.

Drilling mud recycling demonstration

During the demonstration, engineers from Heads sp. z o.o. will demonstrate drilling mud recycling technology using the example of the RU 300 system mobile mud purification unit. This unit has a purification capacity of 300 l/minute of mud for HDD technology. The purification test will take place under field conditions, the mud preparation materials used will be products from the Heads range.

Meadow

13:00 – 14:00

Rodeo HDD

Piotr Kosz

Freestyle Motocross

Freestyle motoross performance (FMX)

drilltrack

DRILLTRACK

Drilltrack of Jędrzejów provides Horizontal Directional Drilling (HDD) services.

Drilltrack offers services for drilling under roads, rivers, canals, railway lines and other hard-to-reach areas. It has HDD drill rigs that are equipped with specialised systems to precisely control the direction of drilling and minimise the impact on the surrounding area.

Drilling rig: AT-BORETEC MT11 ROCKDRILL

drilltrack

JAMAT

Construction contractor JAMAT of Brzezie specialises in trenchless construction, more specifically horizontal directional drilling. Founded in 2011, the family-owned company has grown steadily, gaining a reputation as a skilled and reliable contractor for the installation of energy, water, sewer and gas infrastructure projects. Currently, 17 skilled employees are carrying out pipe installation projects across the country.

Drilling rig: Vermeer D23x30 S3 series

Meadow

14:00 – 15:00

Lunch break

Orangery, Granary

15:00 – 17:00

Technology shows

damian-sobczak

Jacek Kulig

BASE-IP, Schöngen

Complete revitalisation of gravity sewers with Concept PP-HM pipes up to DN560

damian-sobczak

Anna Groffik

Geo-radar

GroundTEM – demonstration of non-invasive measurements using the Time-Domain Electromagnetic Method (TEM)

The measurement system consists of a transmitting and receiving system. Measurements are based on the induction of an electromagnetic field deep into the Earth using an induction loop. When electromagnetic waves encounter different geological layers, eddy currents are generated, which in turn cause a secondary electromagnetic field. The electrical conductivity of the soils and rocks studied is controlled by mineralogy, clay content, water content, salinity and porosity. These waves are then recorded at the surface using a receiver loop. From the resulting logs, the conductivity distribution of the geological medium can be calculated.
The TEM method helps to locate groundwater in particular, monitor the state of the aquifer, and distinguish between different geological deposits.
The demonstration will show how the measurement is carried out - from laying out the measurement system to obtaining the final result from a given measurement point.
Piotr Kosz

Tomasz Szczepański

CBiC
Dariusz Zwierzchowski

Dariusz Zwierzchowski

CBiC

Structural testing of sewer network facilities in practice. On site and in the laboratory

The following tests will be presented and discussed during the demonstration: – pull-off (requirements of EN-PN 1542 for the reality of construction) – GWT – detection of reinforcement – measuring the thickness of the surfacing, laminate, coating – Schmidt hammer

When recognising the technical condition, both during ongoing inspection and during a more detailed assessment related to e.g. expert opinion or design, it is necessary to carry out tests on the structure and its working environment. Some tests are also later part of the acceptance tests after the renovation work has been carried out. Some of the tests are so simple that they can be carried out and the results obtained on site. What is important, however, is to what extent the field conditions influence the correctness of the pull-off test or Schmidt hammer number test, for example, and whether they comply with the requirements of the standards to which they refer. Some of the tests can only be carried out in the laboratory, e.g. testing the compressive strength of concrete or linings, assessment of sulphate contamination or verification of materials by infrared spectra. For these tests, it is crucial to take a representative sample on site.
During the show, the discussion of the above issues will be combined with a live demonstration of field tests, such as the pull-off test, Schmidt hammer, GWT waterproofing test, pH tests, reinforcement detection, resin coating thickness measurement. Specialists will also discuss the interpretation of test results in the context of determining 'compliance with requirements' of, for example, completed works.

Piotr Kosz

Tomasz Borowiak

SAERTEX multiCom

Installation of Saertex's styrene-free potable water transport sleeve using ProKASRO's UV lamp technology

The topic of the demonstration will be the trenchless installation of a styrene-free CIPP sleeve based on vinylester resin using appropriately sized technology.
damian-sobczak

Damian Sobczak

Nodigmarket24

Demonstration of the mini jacking machine with the MMP-35 controlled head

During the demonstration, specialists will show the speed of the jacking machine, the possibility of changing the direction of the jacking or sinking, perform an automatic drilling profile for final documentation and a 2×110 mm double-pipe jacking of 20-30 m.
Piotr Kosz

Freestyle Motocross

Freestyle motoross (FMX) performance - final show

Meadow

19:00 – 23:30

Feast

In the evening, we will invite you to a barbecue feast, during which there will be a Latin music concert.

Granary

DAY 2

12 JUNE

9:00 – 10:40

Trenchless Construction session

Paweł Kośmider

Paweł Kośmider

INŻYNIERIA Publishing House
Cezary Madryas

Prof. Dr.- Ing. Cezary Madryas

Wrocław University of Technology

Opening of the conference

Piwoda Lukasz

Łukasz Piwoda

Gas Transmission Operator GAZ-SYSTEM S.A
Osikowicz Robert

Paweł Szufleński

Gas Transmission Operator GAZ-SYSTEM S.A

Hydrogen transmission network - plans, challenges, ongoing activities

Presentation of information on planned and ongoing activities related to the hydrogen transmission network in the country. The paper will present challenges related both to the construction of new hydrogen transmission infrastructure and to the adaptation of selected parts of the current natural gas transmission network for hydrogen transport.

Roland Kośka

Roland Kośka

Gas Transmission Operator GAZ-SYSTEM S.A

Spectacular new trenchless projects implemented at GAZ-SYSTEM S.A in 2023 - 2024

The talk will present, among other things, the first HDD installations with lyre splitting carried out at the Gas Transmission Operator, as well as the prerequisites for the approval of the installations and the conclusions from their implementation.
Piotr Zakrzewski

Piotr Zakrzewski

Gas Transmission Operator GAZ-SYSTEM S.A.

Tricks of Geotechnics

The paper will attempt to analyse the impact of errors in the recognition of soil and water conditions on the risk of drilling operations. Through the presentation of concrete examples, cases will be discussed in which errors in ground recognition led to serious incidents at the execution stage. In addition, the presentation will address the issue of incorrect interpretation of basic geotechnical parameters.

Adam Bok

Adam Bok

PROMA
Zdjęcie-Toczek-Przemek (1)

Dr.-Ing. Przemysław Toczek​

Akademia Górniczo-Hutnicza

Development through innovation. Research project under the aegis of NCBiR ‘Laminate steel casing pipe - a Polish innovation in horizontal drilling’.

Adam Bok

Magdalena Wasilewska

GGT Solutions S.A.

Implementation of HDD drilling with the Intersect method using the Olszanka Reserve crossing as an example

Adam Bok

Jacek Jaworski

HEADS sp. z o.o.

Systemy recyklingu płuczki wiertniczej szansą dla gospodarki obiegu zamkniętego

Orangery

10:40 – 11:00

Coffee break

Panorama

11:00 – 12:40

Trenchless Construction session

Krzysztof Korzekwa

Krzysztof Korzekwa

Sanimet Krzysztof Grzywacz

Possibilities and limits of microtunnelling

Rupikowski Maciej

Maciej Rupikowski

GGT Solutions S.A.

Opportunities and limitations of Direct Pipe technology

Roland Kośka

Marcin Firkowski

HDI

Capacities and limitations of the HDD method

Osikowicz Robert

Robert Osikowicz

ROE

Panel discussion - Opportunities and Limitations of Microtunneling, HDD and Direct Pipe

Panellists:

Roland Kośka

Marcin Firkowski

HDI
Krzysztof Korzekwa

Krzysztof Korzekwa

Sanimet Krzysztof Grzywacz
Rupikowski Maciej

Maciej Rupikowski

GGT Solutions S.A.
Rupikowski Maciej

Dr hab. inż. Jan Ziaja, prof. AGH

AGH University of Science and Technology

Orangery

12:40 – 13:00

Coffee break

Panorama

13:00 – 14:45

Trenchless Renovation session

Hoffmann Michael

Dr. Michael Hoffmann

SBKS GmbH & Co. KG

CIPP lining. Quality assurance for sustainable rehabilitation

The presentation will highlight the importance of independent testing in ensuring the quality of CIPP liners as a key component of sustainable infrastructure rehabilitation. The speaker will discuss how rigorous testing of these liners not only ensures their effectiveness and durability, but also contributes to more sustainable rehabilitation practices compared to traditional excavation methods.

Roland Kośka

Tomasz Szczepański

Centrum Badań i Certyfikacji sp. z o.o.

Protective coatings and coatings for sewers, manholes and sewer chambers. Overview of available technologies with consideration of their advantages and limitations

Extremely different conditions can prevail in sewer facilities, both from the aspect of the corrosion hazards present and the current state of the structure itself or the feasibility of carrying out repairs at a given location. It is often difficult to reconcile all requirements at the same level, being under pressure of both time and cost. Technological solutions, seemingly correct, may hit a barrier of not being technically feasible at a given site or deteriorate too quickly. Therefore, knowledge of the wide range of potential material solutions related to the protection of these facilities against corrosion, including both their strengths and existing limitations, is key to the proper selection of a material solution and its correct application. The result is a significant increase in the chance of achieving the effectiveness and durability of the work performed, as expected by the client and the contractor. The presentation of practical examples from implementation and comparative statements of the basic characteristics for the various material types will provide the necessary knowledge in the lecture topics.
Kees Den Besten

Kees den Besten

AOC

Renewable sources in relining - sustainable, fast sewer and water pipe rehabilitation

CIPP technology in itself is a highly sustainable solution for the renovation of sewer and water pipes, minimising the negative impact of the work carried out on the environment and the social surroundings. Whether the installation is carried out using hot water or UV curing technology, for both methods AOC - as the world leader in resins for CIPP - offers a wide range of available resin types, which will be discussed during the presentation. In addition, special emphasis will be placed on new types of recycled PET-based resins (rPET), making the technology even more sustainable.

Mariusz Iwanejko

Mariusz Iwanejko

Blejkan S.A.

And the cars are speeding... Renovation of the Riverside collector in Warsaw

Trenchless renovation of a 1600/2000mm sewer over 4.5km long of the combined sewer under Warsaw's main traffic axis at Czerniakowska Street. Many organisational challenges during the design and execution of the works. And above us, the cars are speeding... The public doesn't know what's going on underground, we are wading through the sewage and doing our favourite job - installing GRP pipe modules. The largest renovation contract of recent years in Poland briefly and efficiently shown on the basis of a construction film.

Mariusz Iwanejko

Tomasz Borowiak

SAERTEX multiCom

Why it is so important to select the right sleeve for trenchless renovation of drinking water pipelines

SAERTEX multiCom products will be presented, i.e. fibreglass sleeves for the trenchless rehabilitation of sewer lines, gas pipelines and drinking water transport.
CIPP liners have been used in the sewer sector for decades. In recent years, they have been increasingly used in the drinking water sector. Hygienic, durable and safe - GRP pipe liners have to meet the highest quality standards for trenchless renovation of drinking water pipes. After all, they ensure the supply of drinking water for many people. Drinking water pipes must therefore meet requirements far beyond the scope of gravity flow. They must be able to withstand nominal pressures of up to 16 bar over a long period and meet high hygiene standards. After an intensive development phase, SAERTEX multiCom® launched SAERTEX LINER® H2O, the world's first UV-cured GRP liner for trenchless rehabilitation of drinking water pipes, and presented it at IFAT in 2016. This was based on significant changes to existing products and further new developments in the overall liner design, various testing methods and joining technology. After eight years, we enjoy many positive references from all over the world.

Mariusz Iwanejko

Yuliya Panchy

Hovering Solutions

Autonomous flying robots in sewer network inspection

The Madrid metropolitan area, home to more than 6 million people, boasts one of the largest sewerage networks in Europe, covering more than 15,000 km of sanitary sewers. Periodic inspections of this vast infrastructure are crucial to minimise water loss, prevent pollution and address structural problems. Traditional inspection methods posed risks and were time-consuming. Wheeled robots were ineffective in large diameter tunnels. Autonomous drones became the ideal solution.

The municipal company Canal de Isabel II, responsible for water circulation in Madrid, used Hovering Solutions' autonomous flying robots for underground inspections. The robots operate without remote control, radio communication, GPS/GNSS or lighting. The drones have inspected hundreds of kilometres of sewers, identifying leaks, connections and providing accurate 3D models for tunnels and pipes over 800mm in diameter. The technology was patented in the third quarter of 2023.

The safety benefits of their use include eliminating the need for staff to enter sewers. The drones capture high-quality data, including 3D georeferenced point clouds, high-resolution panoramic images and a comprehensive damage report. This data facilitates a comprehensive assessment of tunnel condition, cross sections and tracking changes over time. Hovering Solutions provides a web-based 3D visualisation platform for easy access and analysis of the data.

Orangery

14:45 – 15:45

Lunch break

Orangery, Granary

15:45 – 16:30

Session III

Bogdan Przybyła

Dr.-Ing. Bogdan Przybyła

Wrocław University of Technology

Acceptance testing of CIPP liners - scope of testing and interests of participants/parties in the project

The scope of acceptance testing of CIPP liners (types of testing and their detailing) is not clearly defined. Contractors and investors may advocate the adoption of different sets of tests due to the protection of their interests and the need to optimise costs. To some extent, this also applies to manufacturers of liners and their components. In practice, one may encounter excessive limitation of the scope of acceptance tests, which results in problems in objectively identifying the causes of failed renovation measures and ultimately does not allow remedial measures to be adopted. The presentation will attempt to discuss these issues as a prelude to generating discussion and establishing consensus, which could be the basis for revising the current Polish acceptance guidelines for CIPP liners.

Panel discussion on the guideline "Acceptance testing of CIPP liners installed in pipelines of external networks and installations" 2.0

DEVELOPMENT TEAM:

Andrzej Kolonko

Dr.-Ing. Andrzej Kolonko

Wrocław University of Technology
Florian Piechurski

Dr.-Ing. Florian Piechurski

Silesian University of Technology
Paweł Popielski

Dr.- Ing. Paweł Popielski

Warsaw University of Technology
Bogdan Przybyła

Dr.-Ing. Bogdan Przybyła

Wrocław University of Technology
Adam Wysokowski

Dr.- Ing. Adam Wysokowski

University of Zielona Góra
Dariusz Zwierzchowski

Dr.-Ing. Dariusz Zwierzchowski

Centrum Badań i Certyfikacji sp. z o.o.

Orangery

16:30 – 17:30

Inspirational lecture

Naval

Naval Paweł Mateńczuk

NAVAL

What engineers can learn from a soldier of the GROM Military Unit

Orangery

20:30 – 3:00

Gala ceremony, TYTAN 2024 awards

During the gala also:
– gala dinner
– entertaining with music
– Illusion show by Frank Jodłowski

 

Orangery

DAY 3

13 JUNE

10:00 – 13:00

Technical excursion

Excursion to the “Enamel” factory museum of Oskar Schindler

Trip