Issues related to the design and construction of retention tanks using traditional and trenchless methods, on the example of the tank in Jarocin
The technical presentation concerns the investment “Reconstruction of the sanitary sewage system and water supply system in the center of Jarocin”. The investment includes, among other things, the construction of large-diameter retention tanks with a diameter of 2,8 m made of GRP pipes, which will be built using the excavation method and the microtunneling method. Thanks to this investment, the city of Jarocin will gain a new sewage system within the old market and will protect historic buildings from flooding.