Complications in the drilling hole on the example of the realization of HDD crossing in Sanoczek
During the paper the installation of the pipeline under the Sanoczek River will be discussed. The speaker will discuss the complications occurring during such a large project. The scale of the project was record-breaking. The length of the hole was 1124 m and the diameter of the installed gas pipeline was 1320 mm.