LIVE TECHNOLOGY SHOWS
An inseparable element of the Trenchless Engineering Conference are live technology shows that include demonstration of machines, equipment and products. Each participant can see how the trenchless works are being executed. Manufacturers of various types of products (e.g. jacking pipes, GRP panels), as well as equipment used in the industry (HDD rigs, mud cleaning systems, jacking equipment, sewer and connections renovation kits) will also present their offer.
- you will see live machine demonstrations
- you will find out how the equipment works
- you will talk to the industry reps
- you will establish business contacts
FOR YEARS WE HAVE WELCOME THE BEST
YOU WILL BUILD THE IMAGE OF AN EXPORT
YOU WILL GET A NEW DIMENSION OF CONTACT WITH THE CLIENTS
100 000 m2 AREA
IN ONE PLACE:
- INVESTORS
- CONTRACTORS
- MANUFACTURERS
- DESIGNERS
- SUPPLIERS
- SCIENTISTS
- EXPERTS
CONFERENCE CONSISTS NOT ONLY OF THE LECTURES, BUT ALSO:
LIVE TECHNOLOGY SHOWS
EXHIBITION
CHILLOUT ZONE
NETWORKING
SEE THE 2019 TECHNOLOGY SHOWS HOVER YOU MOUSE OVER A PHOTO AND FIND OUT MORE
Liner installation in the steel pipe DN800 using an inversion drum and steam as a heat carrier
Evaluation of the condition of the canal after putting on the cap using the Ibos inspection system
Subsite® Electronics HDD guidance system demonstration, TK RECON™ series
Presentation of the milling robot from IBAK
Presentation of the new generation of jacking machines
Minisystem of treatment - organization of a small construction site in terms of drilling mud recycling
Demonstration of the SWP renovation method
Introduction to the latest Optitrac navigation method based on the latest developments in gyro-compass and magnetic navigation
Modern technologies concerning sewage wells inventory using KEPSO CLEVERSCAN device
Assembly of the PREDL-FLEXLINER manhole renovation system.
BRAWOLINER 3D liner (DN300– DN400) renovation
Introduction to the latest Optitrac navigation method based on the latest developments in gyro-compass and magnetic navigation
From planning to implementation - how does the laboratory contribute to the drilling project?