Speakers

Julita Borkowska

Generalna Dyrekcja Dróg Krajowych i Autostrad - Oddział Szczecin

The Oder River Tunnel on the Szczecin Western Bypass – Design and Construction Constraints and Challenges

The presentation will cover topics such as structural design and technical infrastructure solutions, as well as the selection of the optimal tunnel diameter and the reasons for its extension beyond the original plans. The tunnel’s surroundings, the resulting construction constraints, and monitoring requirements will also be discussed.

Civil engineer, bridge engineer. Graduate of the Szczecin University of Technology and the AGH University of Science and Technology. Since 2000, she has gained experience in construction and supervision companies. Since 2007, she has worked at the General Directorate for National Roads and Motorways, Szczecin Branch, as a Project Manager, including on the construction of the Miękowo Bypass on the S3 and the S6 Goleniów-Nowogard. Since 2017, she has been involved in tunnel projects as Project Manager (construction of the tunnel in Świnoujście and the Western Road Bypass of Szczecin on the Police-Goleniów section, including the tunnel under the Oder River in the Police area). She is involved in the tunnel team at GDDKiA, creating guidelines for the construction and maintenance of tunnels.
Translated with DeepL.com (free version)