Longitudinal settlement basin above tunnels bored with a mechanized shield
Head of the Department of Geotechnics, Bridges, and Underground Structures, Warsaw University of Technology.
Author of over 150 publications on tunnel construction and the design and construction of deep excavations. She supervised the construction of the first line and the central section of the second line of the metro, as well as many road tunnels in Warsaw (POW), Gdańsk, and Świnoujście, and railway tunnels (Łódź). Author of analyses concerning the impact of TBM tunnel construction and deep underground structures of tall buildings on the surrounding area and existing tunnels (metro, road, and rail). Member of the Board of the International Tunnelling and Underground Space Association for the 2014-2017 term, Vice-Chair of the Civil and Water Engineering Committee of the Polish Academy of Sciences for the 2024-2027 term, Chairwoman of the PKG Underground Construction Subcommittee, represents Poland in the ITA General Assembly.
